Skip navigation

Sustainable Style for Clean Growth: Innovating Textile Production through Engineering Biology

Summary

Our project is designed to use engineering biology approaches to immediately increase the efficiency of the environmentally friendly manufacturing process of producing this microbial leather. We will work together to engineer bacterial strains and use synthetic biology methods to enable high efficiency use of waste feedstocks, efficient water and nutrient usage, and innovative bio-based treatments for desirable properties, such as colouration, patterns, coatings and additives.

 

The project tackles four main challenges:

  1. Reducing reliance on costly sugars,
  2. Integrating colour and pattern during growth,
  3. Replacing petrochemical-based additives,
  4. Balancing durability with biodegradability.

By doing so, the project supports the UK's net-zero goals and promotes clean growth in fashion, positioning microbial leather as a low-impact, circular, and scalable material for the future.

 

Northumbria Investigators

Prof Meng Zhang and Dr Paul James

 

Project partners

Prof Thomas Ellis (Lead) and Prof Koon-Uang Lee,  Imperial College London

 

Industrial Partners

Colorifix, Modern Synthesis and Brewlab

 

Funder

BBSRC

 

Project duration

2years (May 2024 – May 2026)


Latest News and Features

university partnership
Greenland (credit Dr Sammie Buzzard)
Dr Juna Sathian
UUK Future Jobs event at Northumbria University
Professor Greta Defeyter OBE and Andrew Forsey OBE pictured outside 10 Downing Street.
Illustration of the ecosystem in Antarctica around 90 million years ago. Research shows that wildfires regularly occurred near the South Pole at that time. Credit:  James McKay (University of Leeds).
Dr Lea Ferellec, a Research Fellow based in Northumbria's School of Engineering, Physics and Mathematics
Professor Elliott Johnson and Professor Nicola Wake
More events

Upcoming events

Next Stop Northumbria
The Past We Inherit. The Future We Build: Better Decisions Happen Together
Next Stop Northumbria

Page last updated 22/07/26

Back to top